Our Proposal -  
We propose that Tbuses are initially introduced on to the North Greenwich to Charlton route as a pilot scheme to demonstrate feasibility, practicality and efficency.
Tbus routes
look at the route maps



Introduction
Environment
Design
Overhead
Financial
Engineering
Planning
Regulation
Routes
Industry



Download this website (868k zip file)


Campaigning for quiet, clean urban transport using Overhead Electric, Zero Emission Buses -
email The Electric Tbus Group

The vehicles are to -  
- be 18m long, 3 axle, articulated single deckers
- powered by wheel hub mounted electric motors
- carry 120 passengers, seating 60 passengers in comfort
- be fitted with full internal environment control
- have plenty of room for wheel chairs, baby buggies and luggage
- carry on-board real time passenger service information
- have assistive (electro magnetic) guidance to give precision stopping
- be electrically driven, very quiet in operation and produce zero emissions
- capable of 'off-wire' operation with auxiliary on board power supply

The route is to have -  
- high service speeds and smooth journeys on dedicated surfaces
- raised kerbs for level loading of shoppers, mothers and disabled users
- 'clear' junction priority layouts giving the Tbus the fastest journey time of any road user
- high service head ways, as low as 3 minutes between vehicles
- service stops at 300-350m intervals
- pre-ticketting available at all stops and smart card season tickets
- attractive stops with real time vehicle information, both of Tbuses and underground connections
- passenger perception of service permanence
- seven day a week, morning to night operation
- well trained, customer friendly staff
- easy interchange with other transport modes

The overhead wiring is to be of -  
- optimum overhead layout
- minimum visual intrusion
- minimum size conductors and fittings
- 700mm guage

The electrical system is to be -  
- at a supply voltage of 750v DC fully floating with respect to ground
- supplied by generation sources that are environmentally sustainable

The technologies employed will -  
- be proven state-of-the-art
- be capable of giving 100% reliability
- innovate only if the above conditions can be met

The service can be implemented with planning permission but without the need of a Transport and Works Order as the route is on private Right of Way. The Railway Inspectorate would be responsible for the electrical installation and all health and safety features.